FMF Foods LimitedFMF Production Scheduler
1

Enter the week's orders

+New order

ORD-0001

☰Orders

⊞Planning batch

0
2

Review & confirm

No plan to review yet. Build the schedule in step 1 and it will appear here.

3

Run on the floor

Today
100%
ProductionChangeoverMaintenanceIdle / availableMissedNow

⚙Each line's service

When it is booked, how the scheduler chose that moment, and how long it takes. A maintenance planner or an admin can change the length.

Select a report

Its preview opens here.

Pick a report from the list

Filter it here. Its preview downloads and prints it.

▤Who runs each line

One or more people on a line, each week, Monday to Monday. A person is on one line a week. What each can do there stays what their account allows.

◍User accounts

Tick what each person can do. Reset a password for anyone who cannot sign in. Resets issue a one-time temporary password.

FMF Foods LimitedProduction Operations
Plant 01 Checking system

Bakery Operations

FMF Production
Control

Planning Scheduling Execution

One operational view of Plant 01.

Illustrative schedule preview

Sample data
  • Production
  • Changeover
  • Service
  • Now

Welcome back

Production Control

Sign in to access your Plant 01 workspace.

Trusted devices only. Stays signed in for 30 days. Otherwise you are signed out after 10 minutes without use.

Unauthorized access prohibited.

Shop floor

Production run

Confirm completion

Complete this job?

Urgent order

Choose a different time

Production orders

Import orders from a CSV or Excel file

  1. Select file
  2. Validate
  3. Preview
  4. Import
  5. Confirm
Product codes and customer names

Loading…

Build the schedule

How should the running order be set?

Preventive maintenance

Record service

What state is the machine in now?

Write in the times the service really ran. Once saved, the line shows as serviced for this week and this form cannot be changed.

Step 2 · Confirm

Confirm the production plan

Production begins at the first shift window at or after this moment. A start before a line's shift opens moves to the shift start rather than running the line off-hours.

Account access

Request a password reset

If your account has a recovery email on file, we'll email you a reset link. Otherwise, your request goes to the plant administrator, who will give you a temporary password in person.

Account security

Change your password

Step 2 of 2

Enter your MFA code

Account security

Set up MFA

  1. On your phone, open Google Authenticator or Microsoft Authenticator. Both are free in the app store.
  2. Add an account and scan this QR code.
  3. Type the 6-digit code the app then shows.
Can't scan it? Type this key into the app insteadAccount · time-based

Account security

MFA settings

Still there?

Are you still using the app?

Nothing has been clicked or typed for 10 minutes. To keep the plant data safe, you will be signed out in

1:00

Account security

Set a new password

This link was emailed to the admin recovery address. Choose a new password below.

Account access

Create user account

Admin only. A one-time temporary password is issued — the account must choose its own password at first sign-in.

Changeover

Changeover

Only this changeover changes; the changeover table stays as it is. The plan is re-laid at once: the jobs queued behind it move later if it takes longer, and earlier if it takes less.

Live schedule

Confirm move

Account access

Temporary password issued

Give this to directly. It is shown once and is not stored anywhere in readable form. They must choose a new password when they sign in.

Overdue job

Reschedule

Overdue jobs

Jobs whose slot went by

Each one is kept on record. Give it a new slot, or record it as made if it was.

Overdue jobs

Reschedule all

Most urgent first, then by due date. Each goes to its next free time, and no other job moves.

Order book

Delete this order?

Changes waiting for approval

Turn this down?

Order book

Reject this order?

Bulk approval safety check

Approve selected orders?

Only valid proposed orders will be approved.

Clean slate

Clear every order and plan?

This deletes every order, schedule, production run, insight, notification and audit entry, and cannot be undone. The four lines, the products, shifts, the changeover table and every account are kept, so the team can start entering orders straight away.

↑↓ move · Enter open · Esc close